Puutikankangas, Finland

Stage

Operational

Location/Country

Technology

Wind

Capacity

44 MW



Puutikankangas wind farm in the North Ostrobothnia region, Municipality of Sievi, 8 turbines (44 MW) will be built. Turbines: GE Hybrid towers – GE 158 5.5MW, tip height 240m.

Project Key Facts

Summary:
8 Turbines
Stage:
Operational
Technology:
Wind